• Location

    Perth Foreshore

  • Client

    Leighton Contractors and Broad Construction Services Pty Ltd (Leighton Broad)

  • Timeline

    3 Year Project

  • Size

    Major Project

  • Services

    Utility Location to QLB AS5488 including Utility Vacuum Excavation to QLA (AS 5488), and High-Pressure Gas Supervision

Project Description

Leighton Contractors Pty Limited has been awarded the Elizabeth Quay inlet and public space development contract by the Western Australian State Government. The $200 million project was carried out by Leighton Contractors in conjunction with its subsidiary, Broad Construction Services (WA) Pty Ltd.

The Elizabeth Quay project is one of a series of important State Government initiatives to develop Perth as a contemporary, liveable and globally competitive city, enhancing its appeal for residents, city workers, and visitors alike.

Spanning an area of approximately 10 hectares, the project included constructing a new inlet with associated roads, parks, promenades and an island with a connecting bridge.

Abaxa was engaged as the Preferred Sub Surface Consultant on the project, one of Perth’s CBD biggest projects. Abaxa worked actively with the client to build and be an integral part of the Permit Excavation Management System, where the Abaxa Utility Report was a key supporting document to the excavation permit approval of the Services Manager.

The project was challenged by its CBD location with high underground highway and unplanned utilities, heritage location and the number of subcontractors working in multiple locations across the project that were not aware of the utility risks even when working above ground. The project required multiple highly skilled and experienced technical resources to manage the utility complexities, duty of care and project timeline across multiple, concurrent constructions on the project.

Abaxa took charge of the project and actively promoted and managed the utilities risk at site reporting near miss incidents that contributed to awareness and protecting the public, people and infrastructure on site. There were two utility incidents on site of which Abaxa was instrumental in the investigation as the expert in process and equipment to assist root cause understanding and improvements to prevent similar incidents on site.

Results

Abaxa as experts on the project for Utilities location and verification, Abaxa provided education and awareness of the technical capability of equipment and damage prevention process to support in delivering the project to a high standard with multiple technical experts to align with the project program, supporting incident investigation and Safety Management.

  • Zero lost-time injuries for the entire duration of the contract
  • Specialist to all Subcontractors on the Project, liaising with Utilities Manager
  • Full-time resource for Critical Utility Supervision
  • Were invited to undertake work for the next stage
  • Engaged on Building Constructions including Ritz Carlton at the next stage
94000 projects
completed project clearances in the 20 years of our company's existence
82 % Strikeless
success rate on jobs for the past 12 months
16 accreditations
held and required to perform the work safely
12 technicians
ready and on-site

featured cases

radar

Replace & Upgrade Cast Iron Reticulation Project

The project required a Utility Survey to identify, locate utilities and complete a site features and utility survey to support engineering final design in a replacement plan for water mains constructed more than a century ago in Fremantle. The replacement of water mains was scheduled by the Water Corporation from August to October 2019.

Read More
abaxa team

Freeway Modification Design & Construction Project

For this project, Abaxa was involved with Perth’s first Smart Freeway including creation of an additional lane from Canning Highway to Narrows Bridge. The Smart Freeway will use smart technology to open and close traffic lanes in the event of an incident and adjust speed limits to get more traffic through during busy periods.

Read More

Have a Question or Need a Consult?

Book Site Visit

Abaxa have a contactless flexibility in our work methodology that is safe and compliant with current government restrictions.
Contact us, we are open for business and we will get your job done.